TM 55-1520-238-S
316.3 Remove Tiedowns from Helicopters.
d. Unlock Tail Wheel.
e. Tow Helicopter. Remove chocks and
NOTE
tow helicopter off vessel using shoring as
Tiedowns will normally be removed from
required to provide under belly clearance.
topside helicopters first. These helicop-
f. Position Helicopter at Reassembly
ters will be unloaded before tiedowns are
Area. Tow helicopter to reassembly area
removed from below deck helicopters.
TM 1-1520-238-23).
a. Remove Fuselage Tailboom Tie-
317 HELICOPTER PREPARATION FOR USE
downs. Unfasten and remove chains
AFTER VESSEL SHIPMENT.
from each fuselage station 450 tiedown fit-
ting. Close FS 450 jack pad wire deflector
Preparation of AH64A helicopter for use after vessel
and secure with quick release pin.
shipment will be conducted in accordance with instruc-
b. Remove
Forward
Fuselage
Tie-
tions outlined in paragraph 317.1 through 317.21. All
downs. Unfasten and remove three tie-
assembly will be in accordance with referenced TM's.
down chains from each forward fuselage
tiedown fitting (two fittings, six chains per
317.2 Remove Heat Shrink Film Protective
helicopter).
316.4 Unload Each Helicopter to Dockside (Crane
317.3 Perform
Helicopter
Safety
Check.
Unloading).
TM 1-1520-238-23.
317.4 Unpacking
and
Depreservation.
b. Install Tail Wheel Steering Bar and
317.5 Remove Flyaway Covers.
TM 1-1520-238-23.
use winching yoke (item 5, table 31).
317.6 (If Required) Remove Helicopters from
Intermediate Storage. TM 1-1520-238-23.
c. Remove Chocks.
317.7 (High Density and Maximum Density
d. Position Helicopter at Deck Offloading
Position. Manually position helicopter to
crane pickup point.
317.7.1 (Maximum Density Shipment Only) Install
Wing Pylons. TM 1-1520-238-23 Obtain pylons from
e. Apply Helicopter Brakes and Place
catwalk area.
Chocks. TM 1-1520-238-23.
317.8 (High Density and Maximum Density
f. Install Air Vehicle Sling.
TM 1-1520-238-23.
317.9 (RORO Loaded Vessel Only) Install
317.10 Maximum Density Shipments Only) Install
h. Remove Tail Wheel Steering Bar and
317.11 (Maximum Density Shipments Only) Install
i. Hoist Helicopter From Topside To Dock-
side. Operate crane winch and hoist heli-
317.12 Remove Forward Fuselage Tiedown Fit-
copter down onto dockside or level ground
surface. Use guide ropes to maintain prop-
317.13 Install
Forward
Feed
er alinement.
j. Apply Helicopter Brakes and Place
317.14 (High Density and Maximum Density
Chocks. TM 1-1520-238-23.
Shipments Only) Install Fairings and Access
and step.
l. Remove Chocks and Release Brakes.
317.15 Install Main Rotor Deice Power
m. Position Helicopter at Reassembly
Distributor and Air Data System (ADS) Mast.
Area. Tow helicopter to reassembly area
TM 1-1520-238-23.
317.16 Install Main Rotor Blades. Remove blades
316.5 Unload Helicopters (RORO Loaded Ves-
from blade box and install in accordance with paragraph
sels).
317.17 Connect Helicopter Battery.
b. Provide Brakeman.
TM 1-1520-238-23.
317.18 Perform
c. Connect Tow Bar.
Pitot
Static
Test
MOC.
TM 1-1520-238-23.
TM 1-1500-204-23.
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |