TM 55-1520-238-S
215.18 Unload
Helicopter
Number
Three.
d. Connect Winch.
Remove helicopter number three using same proce-
dures used for helicopter number six (para 215.10).
WARNING
215.19 Unload Four Main Rotor Blades. Remove
two main rotor blade rack sets from cargo floor, under
Helicopters shall be restrained with
helicopter number two fuselage.
winch during offloading. An unre-
215.20 Unload Helicopter Number Two. Remove
strained helicopter may shift suddenly
helicopter number two using same procedures used for
or roll free, causing injury to personnel
helicopter number five (para 215.12).
or equipment damage.
215.21 Unload  Two  Horizontal  Stabilators.
Connect cargo aircraft winch cable to heli-
Remove one stabilator from under nose of helicopter
number one and one from left side of aft cargo floor.
e. Assign Personnel. Assign loading team
215.22 Unload Four Hellfire Launchers. Remove
members to: monitor ramp crest and over-
Hellfire launchers from left side cargo ramp at rear of air-
head and sidewall clearances, operate tail
craft.
wheel steering bar and operate helicopter
215.23 Unload Four Main Rotor Blades. Remove
brakes.
two main rotor blade rack sets from cargo floor, under
f. Remove Tiedowns.
helicopter number one.
215.24 Unload Helicopter Number One. Remove
(1) Unfasten and remove two chains from
each FS 450 tiedown fitting (fig. 217).
helicopter number one using same procedures used for
Close FS 450 jack pad wire deflector
helicopter number five (para 215.12).
and secure with quickrelease pin.
216 HELICOPTER PREPARATION FOR USE
(2) Unfasten and remove three tiedown
AFTER C5 SHIPMENT.
chains from each of two forward fuse-
Preparation of AH64A helicopter for use after C5 car-
lage tiedown fittings (fig. 217).
go aircraft shipment will be performed in accordance
g. Unload Helicopter. Remove restraint
with instructions outlined in paragraph 216.1 through
chains and release helicopter brakes. have
216.21. All assembly will be in accordance with refer-
loadmaster slowly reelout cargo aircraft
enced TM's.
winch, shore tail wheel on ramp for under-
216.1 Preliminary  Safety  Procedures. Before
belly hinge clearance, and carefully guide
starting operations, perform safety procedures outlined
helicopter down loading ramp until main
in paragraph 216.2 and 216.3.
wheels are on ground.
216.2 Ground Helicopters.
h. Disconnect Winch. Disconnect cargo
TM 1-1520-238-23.
aircraft  winch  from  helicopter  (para.
216.3 Perform
Helicopter
Safety
Check.
TM 1-1520-238-23.
i. Remove Tail Wheel Steering Bar and
216.4 Unpacking and Depreservation.
Winching Yoke.  Paragraph 214.6v.
a. Preservation/Depreservation
215.13 Unload  Two  Horizontal  Stabilators.
Checksheet. Record all depreservation
Remove two stabilators from cargo floor forward of heli-
and assembly on preservation/depreserva-
copter number three.
tion checksheet initiated during helicopter
preparation.
215.14 Unload Four Main Rotor Blades. Remove
two main rotor blade rack sets from under helicopter
b. Unpack Shipping Containers. Remove
all shipped (disassembled), boxed or
number four fuselage.
crated helicopter components from ship-
215.15 Unload Helicopter Number Four. Remove
ping containers, crates and cartons.
helicopter number four using same procedures used for
c. Unload Fuselage Package. Remove all
helicopter number five (para 215.12).
disassembled parts, equipment, and re-
215.16 Unload Six Tail Rotor Blades. Remove tail
cords stowed within helicopter (fuselage
rotor blade supports from left side of cargo floor, out-
package items).
board of helicopter number two.
d. Remove Wrapping Material. Remove
215.17 Unload Four Main Rotor Blades. Remove
all tape, twine, plastic wrap, barrier and
two main rotor blade rack sets from cargo floor, under
cushioning materials from shipped items
helicopter number three fuselage.
and helicopter airframe.
Change 1