TM 55-1520-238-S
312.9 (Maximum Density Shipments Only)
f. Apply Helicopter Brakes and Place
Chocks. TM 1-1520-238-23.
g. Remove Sling and Guide Ropes. Un-
312.10 (Maximum Density Shipments Only) Stow
couple crane hook from air vehicle sling link
(lifting eye). Remove sling pins from main
312.11 (RORO Loaded Vessel Only) Remove
rotor head, detach the sling, and untie
guide ropes.
312.12 (High Density and Maximum Density
Shipments Only) Remove and Stow Wings.
i. Install Tail Wheel Steering Bar and
312.13 Install Flyaway
Use winching yoke (item 5, table 31).
and.TM 1-1520-238-23.
312.14 Install Heat Shrink
Film
Protective
NOTE
Tail wheel steering bar will be used to
313 TRANSPORTED GROUND SUPPORT
steer the helicopter on vessel decks.
EQUIPMENT.
j. Remove Chocks and Release Brakes.
k. Position Helicopters on Vessel. Manu-
ally position each helicopter to be shipped
314 MARKING.
to its shipping location. When helicopters
are properly positioned, center tail wheels.
l. Apply Helicopter Brakes and Place
315 HELICOPTER LOADING AND TIEDOWN
Chocks. TM 1-1520-238-23.
(VESSEL SHIPMENT).
n. Remove Tail Wheel Steering Bar and
the loading and tiedown for helicopters and components
for vessel shipment.
o. Install Safety Chains and Release Heli-
copter Brakes.
TM 1-1520-238-23.
WARNING
a. Shoring. The amount of shoring required
will vary greatly depending on vessel de-
To prevent fire or explosion, verify that
sign, dock height, and tide. Contact sup-
armament, canopy jettison, fuel, and
porting transportation office to ensure that
electrical systems are safetied on each
adequate shoring will be available at port.
helicopter prior to loading.
Shoring will be used as required to provide
under belly clearance at base of ramp and
Check and ensure performance of all Preliminary Safety
at crest.
procedures listed in paragraph 311.2.
b. Provide Brakeman. A person will be sta-
315.2 Load Each Helicopter From Dockside
tioned in CPG station throughout loading
(Crane Loading).
operations to apply helicopter brakes as re-
a. Aline Helicopter at Dockside. Position
quired.
helicopter on dock adjacent to vessel deck
c. Loading Helicopter Tail First.
loading location.
(1) Connect tow bar
b. Apply Helicopter Brakes and Place
( TM 1-1520-238-23).
Chocks. TM 1-1520-238-23.
(2) Unlock tail wheel (para 214.6a).
c. Install Air Vehicle Sling.
(3) Tow helicopter on board vessel using
TM 1-1520-238-23.
shoring as required to provide under
d. Install Helicopter Guide Ropes. Tie one
belly clearance.
length of 1/2 inch diameter rope to tail land-
(4) Apply helicopter brakes and place
ing gear arm and one length to each MLG
chocks ( TM 1-1520-238-23).
tiedown fitting.
(5) Perform final positioning.
e. Hoist Helicopter Onto Vessel Deck. Op-
(a) Remove tow bar
erate crane winch and hoist helicopter onto
( TM 1-1520-238-23).
the vessel deck. Use guide ropes.
310
Change 1
|