q. Remove Sling and Crane. Remove sling
j. Disconnect Mast From Mast Base. Re-
quickrelease pins from main rotor head
move 18 nuts and preload indicating wash-
and hoist sling onto the ground. Uncouple
ers from mast base. Discard preload indi-
crane lifting hook from air vehicle sling link
cating washers.
(lifting eye) and remove crane from the
k. Remove Main Rotor Head and Mast
area.
Unit. Remove right side mixer support
225.10.1 Install Main Transmission Left and Right
bolt and loosen forward mixer support bolt.
Access Panels. Install access panels (L200 and
Use mixer bolt torque adapter (item 51,
R200) and engage 12 camloc fasteners on each panel
table 22) with 3/4 drive, 3inch long exten-
sion (item 52, table 22). Slowly raise crane
225.10.2 Remove Ice Detector.
to lift rotor head and mast unit while remov-
TM 1-1520-238-23.
ing forward mixer support bolt. When for-
ward mixer support bolt is removed, lift
a. Wrap ice detector with cushioning material
main rotor head and mast unit out of heli-
(D5) sealed with tape (D13). Secure in
copter.
aft storage bay (R330).
b. Remove two clamps on ice detector warm
l. Secure  Main  Rotor  Drive  Shaft
air tube. Deflect tube to fit under sheet met-
Spring. Position drive shaft spring within
al and secure with tape (D13).
shaft hole at top of main transmission.
225.10.3 Remove `Doghouse' Fairing and Radar
m. Install Transmission Shipping Cov-
Jammer Antenna. Release 16 camloc fasteners and
er. Aline main transmission shipping cov-
remove four screws from fairing (T185). Lift fairing, dis-
er (item 59, table 22) over drive shaft
connect antenna plug from receptacle, and remove fair-
spring and main transmission shaft hole.
ing with antenna in place.
Secure cover to top of main transmission.
225.11 Remove Wire Cutters.
Place 18 removed mast base nuts in bag
a. Remove Main Landing Gear Wire Cut-
and attach to mast base.
ters. TM 1-1520-238-23.
n. Preservation. Thoroughly coat all open
b. Remove Upper and Lower Fuselage
bolt holes and reinstalled hardware with
Wire Cutters.  (TM 1-1520-238-23).
corrosion preventive compound (D4).
c. Component Wrap. Wrap wire cutters
with cushioning material (D5) sealed with
o. ComponentWrap. Wrap exposed end
tape (D13). Secure wrapped wire cutters
of main rotor drive shaft with barrier materi-
in catwalk area.
al (D1) sealed with tape (D13).
225.12 Remove Steps. Paragraph 211.7.
p. Install Main Rotor Head and Mast Unit in
225.13 Remove Horizontal Stabilator. Paragraph
Shipping Carrier. Aline hoisted main ro-
tor head and mast unit over the shipping
225.14 Lock Tail Wheel Landing Gear Strut.
carrier (item 58, table 22). Then carefully
lower the unit into the carrier, guide main
Jack helicopter at FS 450 jacking pad. Use jack (item 50,
rotor drive shaft and mixer support bolts
table 22). Lift tail wheel just clear of ground. Install tail
into mating carrier base supports, and se-
landing gear strut lock (item 60, table 22) over the fully
cure unit to carrier base with four captive
extended tail gear shock strut (fig. 225). Lower and re-
bolts. Install mixer support bolts. Install
move jack.
main rotor head carrier corner straps over
225.15 Stow Vertical Stabilizer.
pitch housing (fig. 224) and secure dis-
a. Remove FMAM Whip Antenna (MWO
connected longitudinal, lateral, and collec-
115202385037 installed) Paragraph
tive mixer clevises to mating carrier turn-
buckles, using retained servoactuator rod
end hardware. After securing unit in carrier
b. Remove Vertical Stabilizer Lower Lead-
remove mixer spreader.
ing Edge Fairing. Release 23 camloc
fasteners at fairing (L510) (fig. 226).
c. Remove  Tailboom  Left  Side  Aft
NOTE
Step. Remove FS 517/WL 129 left side-
step. Wrap step in cushioning material
Mixer spreader will be used again during
(D5) secured with tape (D13). Stow
removal of second helicopter main rotor
wrapped step in catwalk area.
head and mast unit.
Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business