Click here to make tpub.com your Home Page

Page Title: Position Drive Train.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1520-238-S
211.4 Position Drive Train. After removal of main
c. Remove Tailboom Aft Closeout Fair-
ings. Remove 21 screws from fairings
rotor blades, position the drive train so that the main ro-
tor pitch housings are positioned 45 to the centerline of
(L545 and R545).
the fuselage and the tail rotor blades are ``X ed'' horizon-
d. Remove Forward Ammunition Feed
tally as shown in figure 21.
Fairings. Release 10 camloc fasteners
at each fairing (L140 and R140).
211.5 Remove Main Rotor Deice Power Distributor
and Air Data System (ADS) Mast.
e. Stow Fairings and Access Covers. Wrap
fairings and access covers removed in
a. Remove Panel. Remove panel R200.
steps a thru d above with cushioning mate-
rial (D5) secured with tape (D13) and se-
CAUTION
cure in catwalk area.
NOTE
To prevent contamination of main rotor
drive shaft and stand pipe, cover drive
Wing trailing edges will be removed when
plate cover as soon as sensor housing
required for internal connection access on
unit is removed.
extendedrange  capable  helicopters.
Trailing edges will be reinstalled for wing
b. Removal. Remove main rotor deice pow-
stowage.
er distributor and air data system mast (fig.
f. (ExtendedRange Capable Helicopters
23 and TM 1-1520-238-23).
Only)
Remove
Wing
Trailing
c. Secure Cables. Reinstall (for stowage)
Edges. Remove 68 screws from each
removed wire guides and cable clamps.
trailing edge (LW13 and RW13).
Secure cables to deicing housing with twine
211.7 Remove Steps.
(D14).
a. Remove Left Side Steps. Remove FS
d. Main Rotor Drive Plate Cover.
162/WL 148 and FS 162/WL 168 left side
Cover main rotor drive plate cover with bar-
steps
to
permit
wing
stowage
rier material (D1) sealed with tape (D13).
(TM 1-1520-238-23).
e. Connection Closure. Cap or wrap dis-
b. ComponentWrap. Wrap
removed
connected deicing connectors with barrier
steps with cushioning material (D5) se-
material (D1) sealed with tape (D13).
cured with tape (D13).
c. Stow. Stow wrapped steps in catwalk
f. Preservation. Apply corrosion preven-
area.
tive compound (D4) to all exposed sur-
faces of ADS mast and distributor.
211.8 Install Forward Fuselage Tiedown Fittings.
g. Component Wrap. Wrap ADS mast and
NOTE
distributor with barrier material (D1)
sealed with tape (D13).
Landing gear cross tube end studs have
nuts at both ends. One cotter pin and nut
h. Stowage. Stow wrapped ADS mast and
will be removed from each stud, and stud
distributor in pilot station. Secure with lap
will be pulled in direction allowing clear
belt and shoulder harness.
removal.
i. Install Panel. Install panel R200.
a. Remove Main Landing Gear Cross Tube
End Caps. Remove one cotter pin, nut,
211.6 Remove Fairings  and  Access  Covers
and washer from cross tube left and right
end studs. Then pull studs (with pinned
NOTE
nuts in place) from cross tube. Slide caps
from cross tube ends. Retain removed
Only the following fairings and access
studs, washers, and nuts. Discard removed
covers will be removed for C5 shipment.
cotter pins (fig. 25).
a. Remove Wing Fairings. Remove nine
screws from each fairing (LW10, RW10,
NOTE
LW11, and RW11) (fig. 24).
If installed angle of cross tube stud pre-
b. Remove Wing Access Covers. Re-
vents stud removal, helicopter must be
move 16 screws from each cover (LW9 and
jacked or lifted and cross tube turned
RW9).
(TM 1-1520-238-23).
Change 1
29

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business