Click here to make tpub.com your Home Page

Page Title: NYLON TUBING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9-2320-270-20-2
NYLON TUBING
This task covers:
d. Repair of Tube-End Section (page 4-643)
a. Replacement (page 4-634)
e. Repair of In-Line Section (page 4-647)
b. Repair at Connection (page 4-639)
c. Repair of In-Line Break (page 4-641)
INITIAL SETUP
Materials/Parts Continued
Tools
Nylon airhose (as required)
Hammer, plastic
Sleeve, compression (as required)
Handle, ratchet, 3/8-inch drive
Union, tubing, brass compression
Pliers, diagonal cutting
(as required)
Pliers, long-nose
Soap, liquid (item 14, appendix C)
Pliers, slip-joint, straight-nose
Tape, pressure sensitive
Knife, pocket
(item 21, appendix C)
Socket, 1/2-inch, 3/8-inch drive
Wrap, tie (item 24, appendix C)
Wrench, box, 1/2-inch
Wrench, open-end, 9/16-inch
Personnel Required
Wrench, open-end, 5/8-inch
One
Materials/Parts
Insert, nylon tubing reinforcing
(as required)
ACTION
REMARKS
ITEM
LOCATION
NOTE
This procedure applies to all nylon tubing air lines. Quick release valve-to-bulkhead
fitting nylon tube is shown.
REPLACEMENT
WARNING
Make sure all pressure is drained from air system before disconnecting air lines. Parts
under pressure can, when removed, fly off with great force causing injury to personnel.
NOTE
Tag tubes according to general maintenance instructions (page 4-1).
4-634

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business