|
|
TM 9-2320-269-34-1
ETHER SUPPLY LINES
This task covers:
a. Removal (page 2-384)
c.
Inspection/Replacement (page 2-386)
b. Cleaning (page 2-385)
d.
Installation (page 2-386)
INITIAL SETUP
Tools
Materials/Parts - Continued
Extension, 3/8-inch drive, 3-inch,
Solvent, drycleaning (item 49, appendix B)
Handle, ratchet, 3/8-inch drive
Tape, teflon, sealing (item 55, appendix B)
Socket, 3/8-inch drive, 1/2-inch
Wrench, open-end, 3/8-inch
Personnel Required
(two required)
Wrench, open-end, 7/16-inch
One
Equipment Condition
Materials/Parts
Left side hood panel raised
Lockwasher, clamp (two required)
(TM 9-2320-269-20-1).
Rags, wiping (item 42, appendix B)
Air cleaner removed (TM 9-2320-269-20-1).
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
Ether fumes are flammable under pressure and can explode. To avoid serious injury or death, do not
smoke, allow open flame near, or hit ether cartridge with tools.
1. Coupling (1) and
Tube (3)
Using 3/8-inch and 7/16-inch open-end
fitting (2)
wrenches, unscrew and take out.
2. Two intake manifold
Two tubes (5)
Using two 3/8-inch open-end wrenches,
connectors (4)
unscrew and take off.
3. Two clamps (6)
Two screws (7) and
a. Using 112-inch socket, 3-inch
lockwashers (8)
extension, and ratchet handle with
3/8-inch drive, unscrew and take out.
b. Get rid of lockwashers (8).
4.
Two tubes (5) and
a. Take out.
fitting (2)
b. Take off clamps (6).
2-384
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |