|
|
TM 9-2320-269-34-1
ETHER SUPPLY LINES - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSPECTION/REPLACEMENT
NOTE
For more information on how to inspect parts, go to General Maintenance Instructions (page 2-46).
9.
Fitting (1) and
a. Check for cracks and stripped and
two intake manifold
gouged threads.
connectors (2)
b. Replace as needed.
10.
Three tubes
a. Check for cracks, sharp bends, and
(3) and (4)
wear.
b. Check six nuts (5) for stripped and
gouged threads.
c. Replace as needed.
INSTALLATION
11.
Two intake
Two intake manifold
a. Wrap threads with teflon tape
manifolds (6)
connectors (2)
b. Screw on, and tighten using 7/16-inch
open-end wrench.
12.
Fitting (1)
Two tubes (3)
Screw on, and tighten using two 3/8-inch
open-end wrenches.
13.
Two intake
Two tubes (3) and
a. Put on clamps (7).
manifolds (6)
fitting (1)
b. Put in place.
14.
Two clamps (7)
Two new lockwashers
Screw in part way.
(8) and screws (9)
15.
Two intake manifold
Two tubes (10)
Screw on, and tighten using 3/8-inch
connectors (2)
and 7/16-inch open-end wrenches.
16.
Two clamps (7)
Two screws (9)
Tighten using 1/2-inch socket, 3-inch
extension, and ratchet handle with 3/8-
inch drive.
2-386
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |