Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
ETHER STARTING AID - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
53.
Control cable (11)
Cable stop (14)
Put on.
54.
Cable stop (14)
Screw (15)
Screw in, and tighten using 7/16-inch
open-end wrench and 1/4-inch flat-tip
screwdriver.
55.
Fuel valve (1)
Cap (16)
Unscrew, and take out.
56.
New gasket (17) and
Screw in, and tighten.
ether cartridge (18)
57.
Two studs (19)
Tank clamp (20)
Put on.
58.
Two new lockwashers
Screw on, and tighten nuts (22) using two
(21) and nuts (22)
1/2-inch open-end wrenches.
NOTE
FOLLOW-ON MAINTENANCE: Close left side hood panel (TM 9-2320-269-20-1).
TASK ENDS HERE
TA238164
2-383

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business