Click here to make tpub.com your Home Page

Page Title: MARKING.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1520-238-S
the helicopter CPG station will be
219 TRANSPORTED GROUND SUPPORT
occupied by a qualified person to
EQUIPMENT.
operate brakes.
220 MARKING.
CAUTION
221 HELICOPTER LOADING AND TIEDOWN (C5
To prevent damage to helicopter and
cargo aircraft, use shoring as nec-
AIRCRAFT SHIPMENT REAR DOOR LOADING).
essary under helicopter main and
tail wheels to provide clearance be-
221.32 provide procedures for the loading and tie
tween helicopter underbelly and
down of six AH64A helicopters loaded through the rear
cargo aircraft ramp hinge.
door of a C5 cargo aircraft. The loaded configuration of
To prevent damage to helicopter and
the C5 aircraft is shown in figure FO1.
cargo aircraft, ensure that rotor
221.1 Air Force Responsibilities During Load-
head and tail rotor are properly posi-
ing. Paragraph 21 and 214.1. Also the Air Force
tioned prior to approaching cargo
loadmaster shall direct kneeling and erecting operations
aircraft.
during loading.
To prevent damage to helicopter and
221.2 Army Unit Responsibilities During Load-
cargo aircraft, chocks shall be used
ing.  Paragraph 22 and 214.2. Also the Army Unit
to prevent the helicopter from mov-
shall connect, test, and operate hydraulic kneeling cart.
ing past the stated cargo aircraft fu-
selage station.
221.3 Shoring. Paragraph 214.3.
Ensure that C5 crew stair ladder is
221.4 Verify Preliminary Safety Procedures.
fully extended prior to loading heli-
copter.
WARNING
a. Unlock Tail Wheel Swivel. Paragraph
To prevent fire or explosion, verify that
armament, canopy jettison, fuel and
b. Install Tail Wheel Steering Bar and
electrical systems are safetied on each
Winching Yoke.  Paragraph 214.6b.
helicopter prior to loading.
NOTE
Tail wheel steering bar will be used to
221.5 Load Rocket Launchers. Position twelve
steer helicopter and to keep main and tail
boxed rocket launchers on left side of forward cargo
wheels on loading ramps.
ramp (fig. FO1).
c. Connect and Checkout Hydraulic Cart.
221.6 Load Ground Support Equipment. Position
boxed ground support equipment on right side of for-
ward cargo ramp (fig. FO1).
WARNING
221.7 Load  Helicopter
Number
Six
Nose
Prior to operating hydraulic cart,
First. Figure FO1.
personnel must be thoroughly fa-
miliar with operation and safety pro-
WARNING
cedures contained in paragraphs
810, 811, 812, and 813.
To prevent injury to personnel and
Personnel must remain clear of heli-
damage to helicopter and cargo air-
copter during kneeling and erecting
craft from helicopter rolling free, the
operations to prevent injury to per-
helicopter will be restrained with
sonnel in event of main landing gear
chains and wheel chocks prior to re-
strut collapse and helicopter roll
leasing tension on winch cable.
over.
To prevent injury to personnel and
damage to helicopter and cargo air-
Connect hydraulic cart to helicopter (para-
craft in the event of winch failure,
Change 1
235

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business