TM 5-5430-209-12
(3) Working from inside the tank, hammer all
bolt heads (1), except bolts with nuts, squarely into the
channels (2).
g. Installing Last Stave in Second Ring. The last
stave (1, fig. 8-36), with its bottom chime bolts (2), is
installed following the procedure in paragraph 8-14e.
1. FIRST STAVE OF THIRD RING
2. BOLT
ME 5430-209-12/8-37
1. LAST STAVE IN SECOND RING
2. CHIME BOLTS PUSHED OUT OF POSITION
Figure 8-37. Hoisting first stave of third ring.
ME 5430-209-12/8-36
(2) Move the pole (1, fig. 8-32) and position it as
shown in figure 8-33 following the procedures in f above,
Figure 8-36. Hoisting last stave into position in second
for installation of remaining third ring staves.
ring
k. Installing First Stave in Third Ring. The first
stave of the third ring (1. fig. 8-37) is raised and placed
and install a scaffold around the top chime of the
according to the procedures in e above.
second ring staves.
l. Installing Remaining Third Ring Staves. The
i. Dressing Top Chime of Second Staves. Refer to
second (1, fig. 8-38) intermediate, and last staves are
installed following the procedures in f, g, h, and j above.
wedge and strip gaskets on the top chime.
j. Gin Pole.
(1) Remove the pole and locate it as shown in
installation of the first stave in the third ring.
8-21
|