TM 5-5430-209-12
(f) Apply sealing compound (fig. 3-16)
to the inside bottom chime of the staves.
1.
SCAFFOLD BRACKET
2.
BOLT
1. JOINT SEAM
3.
SCAFFOLD BOARD
2. BOLT
4.
LASHING WIRE
3. BOTTOM CHIME OF STAVE
5.
FOOTWALK POST
6.
ROPE RAIL
Figure 3-16. Applying sealing compound to bottom
chimes of staves.
Figure 3-17. Location of scaffold around top chime of
3-8. Scaffold
staves
a. General. Prior to installation of tank deck it is
(a) Determine which bolts (2) will be
necessary to install a portion of the scaffold components
used to secure the brackets. Remove nuts and washers
around the top chime of the staves.
Scaffold
from these bolts.
components are provided in the storage tank erection
(b) Install brackets as shown in figure
outfit.
3-17 and secure with nuts.
b. Installation.
(1) Install a scaffold bracket (1, fig. 3-17) on
WARNING
alternate stave lap seams, around top chime. on
Scaffold planks must be tested on
outside of tank.
the ground to be sure they are sound
and free from defects.
Before
completion of tank, planks will be
supporting personnel 9 feet in the
air.