Click here to make tpub.com your Home Page

Page Title: Section III. ASSEMBLY AND INSTALLATION OF TANK CENTER SUPPORT ASSEMBLY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5430-209-12
1. SECOND STAVE IN THIRD RING
2. FIRST DECK SECTION
3. TRUSSED RAFTER
ME 5430-209-12/8-38
Figure 8-38. Installing third ring staves
Section III. ASSEMBLY AND INSTALLATION OF TANK CENTER SUPPORT ASSEMBLY
8-15. Assembly of Umbrella-Type Deck Support
a. General. The umbrella-type deck support
(2) Insert splice bolts through ring halves and
splice plates in that order. Install and tighten nuts.
consists of two semi-circular rings. Each half ring is
(3) Reverse position of assembled ring so that
fitted on the inside with five gusset plates, two splice
flanged end is up.
plates, ten channel braces, and a gusset collar.
b. Assembly.
(4) Attach eight pieces of channel brace 12. fig.
8-39) to the ring (1).
(1) Set the ring halves on tank bottom, flanged
end down, with splice ends butted together.
8-22

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business