Click here to make tpub.com your Home Page

Page Title: Breathing Apparatus, Self-Contained: M23 and M23A1.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM43-0002-31
c. Mechanical Means. See paragraph 2-8.
(1) Fasten incendiary grenade at location
d. Fire (para 2-14). Burn with combustible mate-
rials.
specified for charge above.
(2) Place pressure-demand regulator and
facepiece group under pressure reduction valve.
(3) Ignite grenade.
3-18. Breathing Apparatus, Self-Contained: M23
and M23A1.
3-19. Collective Protection Equipment, CBR: Bat-
tery Control Central, HAWK, M10 (not installed).
Always bleed pressurized air from units such as
flamethrowers, riot control agent dispersers,
breathing apparatus pressure cylinders, or other
When using demolition or fire as a method of
compressed gas cylinders. Leave valves open
destruction for chemically contaminated equip-
after pressurized air is bled from cylinders.
ment (alarms, filters, etc.), personnel should
Instant release of pressurized air or gas can
mask and move upwind of the site. if unable to
cause death or injury to personnel.
move upwind of the site, personnel must wear
protective clothing and masks.
a. Priorities for Destruction:
(1) Pressure-demand regulator
(2) Pressure reduction valve
a. Priorities for Destruction:
(1) Vaneaxial fan
(3) Facepiece group
(2) Filters
b. Preferred Methods of Destruction:. Mechanical
(3) Plenums
means, demolition, and fire.
(4) Fabric enclosure and frame
c. Mechanical Means: See paragraph 2-8.
b. Preferred Methods of Destruction. Mechanical
d. Demolition (para. 2-11):
means, demolition, and fire.
(1) Lay apparatus down.
c. Mechanical Means. See paragraph 2-8.
(2) Fasten 1/2-pound explosive charge on
d. Demolition (para 2-11). Fasten 1/2-pound
pressure reduction valve next to compressed air
explosive charges at as many of the following
cylinder (fig 3-21).
locations as time permits. Detonate all charges
(3) Place pressure-demand regulator and
at the same time.
facepiece group over charge and detonate.
(1) M18 gas-particulate filter unit (fig 3-22).
Place charges directly below vaneaxial fan, in
inlet plenum, on center of lower exhaust plenum,
and in prefilter.
Figure 3-22. Explosive Charge Locations
for M18 Gas-Particulate Filter Unit - M10
Figure 3-21. Explosive Charge Location
Collective Protection Equipment (HAWK).
for M23/M23A1 Breathing Apparatus.
3-12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business