|
|
TM 9-2350-238-20-1
Step 2.
Place red probe on pin C (lead 401). Ground black probe. Set START-
OFF-RUN switch to START. If multimeter indicates about 24 volts, go to
step 3. If multimeter indicates no voltage, replace personnel heater control
box. Refer to page 2-1103. Set START-OFF-RUN switch OFF. Connect
wiring harness.
Step 3.
Place red probe on pin A (lead 402 R). Ground black probe. Set START-
OFF-RUN switch to START, then to RUN. If multimeter indicates about 24
volts in both switch settings, go to step 4. If multimeter indicates no voltage
in both switch settings, replace personnel heater control box. Refer to page
2-363
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |