|
|
TM9-2320-270-20-3
WINCH
This task covers:
a. Removal (page 4-1136)
b. Installation (page 4-1138)
INITIAL SETUP
Materials/Parts Continued
Tools
Lockwashers, winch base (four required)
Chain
Packing, preformed, hoses (two required)
Extension, 5-inch, 3/4-inch drive
Tag, marking (item 18, appendix C)
Handle, ratchet, 3/4-inch drive
Tape, teflon (item 22, appendix C)
Lifting equipment
Socket, 1 1/2-inch, 3/4-inch drive
Personnel Required
Wrench, open-end, 9/16-inch
Wrench, open-end, 5/8-inch
Two
Wrench, open-end, 1 1/2-inch
Wrench, pipe, 12-inch
Equipment Condition
Materiais/Parts
Winch cable removed (page 4-1140).
Pusher axle tire removed (TM 9-2320-270-10).
Hose plugs
Lockwashers, hose clamp (eight
required)
ACTION
REMARKS
ITEM
LOCATION
REMOVAL
a. Using 5/8-inch wrench, unscrew and
Four screws (2) and
1. Two hose clamps (1)
take off.
Iockwashers (3)
b. Get rid of lockwashers (3).
a. Pull off.
Two hose clamps (1),
2. Hydraulic motor (4)
b. Get rid of packing (6).
hose (5), and
c. Plug hose (5).
packing (6)
There are two hose ports on motor.
Repeat steps 1 and 2 to remove other
hose.
NOTE
Tag lines according to general maintenance instructions (page 4-1).
Using 9/16-inch wrench, unscrew and pull
Hose (8)
3. Tee (7)
off.
4-1136
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |