|
|
TM9-2320-270-20-3
WINCH - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
INSTALLATION
WARNING
Some parts are heavy. Be careful when handling them. Lifting equipment is needed
when parts weigh over 50 pounds (23 kg) for a single person lift, over 100 pounds
(45 kg) for a two person lift, and over 150 pounds (68 kg) for a three or more person
lift. Do not try to handle heavy parts without lifting equipment. Keep clear of heavy parts
supported only by lifting equipment. Failure to observe this precaution could cause
serious injury or death of personnel.
a. Attach lifting equipment.
Winch (2)
7. Winch base (1)
b. Using lifting equipment, place in
position.
With help from assistant, screw on and
Eight screws (3),
8.
tighten using 1 1/2-inch wrench, socket,
new lockwashers (4),
handle, and extension.
and nuts (5)
a. Wrap threads with teflon tape
Hose (7)
9. Tee (6)
(page 4-1).
b. Screw on and tighten using 9/16-inch
wrench.
Screw on and tighten using 9/16-inch
Hose (8)
10.
wrench.
a. Remove plug.
New packing (10) and
11. Hydraulic motor (9)
b. Place in position.
hose (11)
Place in position.
Two hose clamps (12)
12.
Screw in and tighten using 5/8-inch
Four screws (13) and
13. Two hose clamps (12)
wrench.
new lockwashers (14)
There are two port hoses to motor.
Repeat steps 11 to 13 for other
hose.
4-1138
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |