|
|
TM 9-2320-270-20-1
DIRECTIONAL SIGNAL CONTROL - CONTINUED
INSTALLATION CONTINUED
NOTE
FOLLOW-ON MAINTENANCE:
1. Connect battery ground cable (page 4-444).
2. Check operation (TM 9-2320-270-10).
3. Close instrument panel (page 4-244).
TASK ENDS HERE
DIRECTIONAL SIGNAL FLASHER
This task covers:
a. Removal (page 4-318)
b. Installation (page 4-319)
INITIAL SETUP
Equipment Condition
Personel Required
Battery ground cable disconnected,
One
instrument panel open (page 4-244).
Materials/Parts
Tag, marking (item 18, appendix C)
ACTION
REMARKS
ITEM
LOCATION
REMOVAL
CAUTION
Make sure battery ground cable is disconnected before replacing the directional signal
flasher to prevent possible damage to electrical system.
NOTE
Tag wires according to general maintenance instructions (page 4-1).
Unplug.
Wire 080 (3)
1. Flasher (1)
Terminal X (2)
Unplug.
Gray wire (5)
2. Terminal P (4)
Unplug.
Black wire (7)
3. Terminal L (6)
4-318
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |