|
|
TM 9-2320-269-34-1
TORQUE CONVERTER
This task covers:
a. End Play Check (page 2-692)
c. Inspection/Replacement (page 2-697)
b. Disassembly (page 2-693)
d. Assembly (page 2-698)
c. Cleaning (page 2-696)
INITIAL SETUP
Tools
Materials/Parts
Caliper, micrometer, ID,
Gasket, hub
0.5 to 2-inch range
Grease, oil soluble (item 21, appendix B)
Chisel, cold hand, 1/2-inch
Lockplates (four required)
Driftpin, brass, 3/16-inch
Packing, performed, clutch backing plate
Driftpin, brass, 112-inch
Packing, performed, clutch piston
Extension, 1/2-inch drive, 3-inch
Packing, performed, cover assembly
Gage, converter end play
Packing, performed, impeller assembly
Hammer, ball-peen, machinist's
Rags, wiping (item 42, appendix B)
Hammer, rubber
Solvent, drycleaning (item 49, appendix B)
Handle, ratchet, 1/2-inch drive
Indicator, dial
Personnel Required
Installer, cover bushing
Installer, stator, thrust bearing
One
Pliers, snapring
Press, arbor, hand-operated
Equipment Condition
Retrieving tool, magnetic
Ring, stator roller retainer
Torque converter removed
Screwdriver, flat-tip, 1/8-inch
Socket, 1/2-inch drive, 1/2-inch
Socket, 112-inch drive, 7/16-inch
Stone, soft
Wrench, torque, 1/2-inch drive,
0 - 150 ft-lb capacity
ACTION
LOCATION
ITEM
REMARKS
END PLAY CHECK
1.
Torque converter (1)
Using converter end-play gage and dial
indicator, check end play.
If end play is more than 0.025-inch
(0.64 mm), use same spacer
during assembly. If major part is
replaced during Inspection, use a
new spacer.
2-692
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |