|
|
TM 9-2320-269-34-1
INTAKE MANIFOLDS - CONTINUED
INSTALLATION - CONTINUED
NOTE
FOLLOW-ON MAINTENANCE:
1. Install fuel injection pump (page 2-278).
2. Install ether starting aid and bracket (2-374).
TASK ENDS HERE
This task covers:
a. Removal (page 2-233)
d. Inspection/Replacement (page 2-234)
b. Disassembly (page 2-234)
e. Assembly (page 2-234)
c. Cleaning (page 2-234)
f. Installation (page 2-235)
INITIAL SETUP
Tools
Materials/Parts - Continued
Extension, 318-inch drive, 6-inch
Rags, wiping (item 42, appendix B)
Handle, ratchet, 1/2-inch drive
Solvent, drycleaning (item 49, appendix B)
Screwdriver, flat-tip, 3/8-inch
Socket, deep-well, 1/2-inch drive,
Personnel Required
9/16-inch
Socket, 112-inch drive, 3/4-inch
One
Wrench, open-end, 9/16-inch
Wrench, open-end, 3/8-inch
Equipment Condition
Materials/Parts
Left or right side engine compartment hood
open (TM 9-2320-269-20-1).
Gasket (four required)
Lockplates (five required)
ACTION
LOCATION
ITEM
REMARKS
NOTE
This procedure covers left side exhaust manifold. Procedure is the same for right side.
2-232
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |