Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
INTAKE MANIFOLDS - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
23.
Intake manifold (1)
Eight washers (9),
Screw in, and tighten using 9116-inch
screws (10), and
ratchet handle with 318-inch drive and
two extension clips
9/16-inch open-end wrench.
(11) on right side
intake manifold (12)
24
Swirl destroyer
Ball joint (14)
Snap on.
ball (13)
25.
Intake manifold (1)
Cable bracket (15)
Put in position.
drive cable (16)
26.
Cable bracket (15)
New lockwasher (17)
Screw in, and tighten using 9/16-inch
and screw (18)
open-end wrench.
27.
Intake manifold (1)
Screen (19)
Put in place.
28.
Right side intake
Adapter (20) and
a. Screw in, and tighten adapter (20)
manifold (12)
tube (21)
using 718-inch open-end wrench.
b. Screw on, and tighten tube (21) using
7/8-inch and 15116-inch open-end
wrenches.
2-231

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business