TM 9-2320-269-34-1
FLYWHEEL HOUSING
This task covers:
a. Removal (page 2-137)
d. Inspection/Replacement (page 2-138)
b. Disassembly (page 2-138)
e. Assembly (page 2-139)
c. Cleaning (page 2-138)
f. Installation (page 2-139)
INITIAL SETUP
Tools
Materials/Parts - Continued
Face, inserted hammer, soft-plastic
Rags, wiping (item 42, appendix B)
Handle, ratchet, 112-inch drive
Solvent, drycleaning (item 49, appendix B)
Hoist, with lifting sling
Holder, inserted hammer-face
Personnel Required
Socket, 1/2-inch drive, 13/16-inch
Wrench, pliers
One
Materials/Parts
Equipment Condition
Gasket, flywheel housing
Starting motor removed
Pin, dowel (two required, as needed)
(TM 9-2320-269-20-1).
Flywheel removed (page 2-134).
ACTION
LOCATION
ITEM
REMARKS
1.
Flywheel housing (1)
Two screws (2) and
a.
Attach
lifting sling and hoist.
washers (3)
b.
Using 13116-inch socket and
ratchet
handle with 1/2-inch drive,
unscrew and
take out.
2.
Two screws (4)
Using 13116-inch socket and ratchet handle
and washers (5)
with 112-inch drive, unscrew and take out.
TA237994