|
|
TM 9-2320-269-34-1
FLYWHEEL
This task covers:
a. Removal (page 2-134)
c. Inspection/Replacement (page 2-135)
b. Cleaning (page 2-135)
d. Installation (page 2-136)
INITIAL SETUP
Tools
Materials/Parts
Bar, breaker, 18-inch
Pin (as required)
Face, Inserted hammer, medium-plastic
Rags, wiping (item 42, appendix B)
Hammer, ball-peen, machinist's, 3-lb
Solvent, drycleaning (item 49, appendix B)
Handle, ratchet, 1/2-inch drive
Handle, ratchet, 3/4-inch drive
Personnel Required
Holder, Inserted hammer-face
Punch, drive-pin, 3/16-inch
Two
Socket, 1/2-Inch drive, 3/4-inch
Socket, 3/4-inch drive, 2-inch
Equipment Condition
Tire Iron, curved-spoon type, 24-inch
Wrench, torque, 1/2-inch drive,
Engine uncoupled from transmission
0-200 ft-lb capacity
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1.
Reinforcement
Seven screws (2)
Using 3/4-inch socket and
ratchet handle
ring (1)
with 1/2-inch drive, unscrew and
take out.
It may be necessary for an assis-
tant to use 2-inch socket, ratchet
handle with 314-inch drive, and
breaker bar on crankshaft pulley
nut so that crankshaft will not
move.
2.
Crankshaft (3)
Reinforcement ring
Pull off.
(1) and flywheel (4)
3.
Crankshaft (3) and
Adapter plate (6)
Using curved tire Iron, pry off.
flywheel housing (5)
4.
Adapter plate (6)
Pin (7)
a.
Using 3/16-inch drive-pin punch
and
3-lb ball-peen hammer, drive out.
b.
Get rid of.
2-134
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |