TM 32-6110-003-24&P
Table 5-4. Power Distribution Box Troubleshooting Procedure - Continued
Step
Test Point
Test Equipment
Procedure
Normal Indication
If Indication is
If Indication is
Normal
Abnormal
Open circuit.
If shorted at any
3 Cont
b.
Set circuit breakers CB1 thru
connector
pin,
CB8 to off (out) position and
replace
circuit
repeat step 3a. (See figure 5-3.)
breaker (see table 5-
5).
c. Set circuit breakers CB1 thru CB8
Proceed with step
to on (in) position.
4.
4
J4, J5, J11, J9
Same as step 2.
a. Measure voltage between ground
+28 V dc for each
If voltage is missing
stud and each connector pin
check.
for
one
circuit
listed in table 5-6.
breaker,
replace
defective
circuit
breaker. If voltage is
missing for more than
one circuit breaker,
replace relay K3.
If voltage for one
circuit breaker at one
connector pin and not
at another, check
internal wiring (see
figure FO-1).
b.
Set circuit breakers CB9 thru
CB11 and CB15 thru CB20 to
off (out) position. (See figure 5-
3.)
5-8
|