TM 32-6110-003-24&P
Table 5-4. Power Distribution Box Troubleshooting Procedure - Continued
Step
Test Point
Test Equipment
Procedure
Normal Indication
If Indication is
If Indication is
Normal
Abnormal
4 Cont
c.
Wait approximately 5 minutes,
OV for each check.
If voltage present at
then repeat step 4a.
any connector pin,
replace relate circuit
breaker (see table 5-
6).
Proceed with step
d.
Set circuit breakers CB9 thru
5.
CB11 and CB15 thru CB20 to on
(in) position. (See figure 5-3.)
AC Input Tests
a. Set MISSION POWER switch to
5
J10
Power supply,
off (down) position.
Connector
assembly
P8,
WARNING
Test cable W1,
Ground
chassis before
applying
Test cable W2
power
Connector
Assembly P2
b.
Establish test setup shown in
c. Set MISSION POWER switch to
ON (up).
d.
Refer to figure FO-1. with
115V ac
If all outputs are
multimeter connected to J1-F,
defective,
check
measure all 115V ac output
relay K2 coil circuits
circuits.
and replace K2 if
necessary
5-9
|