Click here to make tpub.com your Home Page

Page Title: Table 5-4. Power Distribution Box Troubleshooting Procedure (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 32-6110-003-24&P
Table 5-4. Power Distribution Box Troubleshooting Procedure - Continued
Step
Test Point
Test Equipment
Procedure
Normal Indication
If Indication is
If Indication is
Normal
Abnormal
4 Cont
c.
Wait approximately 5 minutes,
OV for each check.
If voltage present at
then repeat step 4a.
any  connector  pin,
replace relate circuit
breaker (see table 5-
6).
Proceed with step
d.
Set circuit breakers CB9 thru
5.
CB11 and CB15 thru CB20 to on
(in) position. (See figure 5-3.)
AC Input Tests
a. Set MISSION POWER switch to
5
J10
Power  supply,
off (down) position.
Connector
assembly
P8,
WARNING
Test cable W1,
Ground
chassis  before
applying
Test cable W2
power
Connector
Assembly P2
b.
Establish test setup shown in
c. Set MISSION POWER switch to
ON (up).
d.
Refer to figure FO-1. with
115V ac
If  all  outputs  are
multimeter connected to J1-F,
defective,
check
measure all 115V ac output
relay K2 coil circuits
circuits.
and replace K2 if
necessary