TM 32-6110-003-24&P
Table 5-4. Power Distribution box Troubleshooting Procedure - Continued
Step
Test Point
Test Equipment
Procedure
Normal Indication
If Indication is
If Indication is
Normal
Abnormal
+28 V dc for each
If voltage missing at
5 Cont
e.
With multimeter connected to
check.
connector pin J10-G,
ground stud , measure voltage at
replace
circuit
connector pins J10-G, J10-R,
breaker CB14, filter
and J10-L.
FL1, or relay K1.
If voltage missing at
connector pin J10-R,
replace
circuit
breaker CB12 filter
FL3, or relay K1.
If voltage missing at
connector pin J10-L,
replace
circuit
breaker CB13 filter
FL2, or relay K1.
f. Set circuit breakers CB12 through
+28 V dc slowly
Proceed with step
If voltage present at
CB14 to off (out) position and turn
bleeding down to 0
6.
J10-L, J10-G or J10-
power supply off. Connect a 600
volts.
R, replace related
ohm, 2 W resistor between J10-L
circuit breaker.
and ground to bleed off the in-line
filter discharge. Monitor the dis-
charge with a multimeter. Repeat
the procedure for J10-G and J10-
R. (See figure 5-3.)
5-10
|