|
|
TM 32-6110-003-24&P
Table 5-6. DC Voltage Output Checks
Connector pin
Circuit breaker
J4-A
CB16 (ARC-186)
J5-D
CB17 (F1429)
J5-M
CB20 (KG-45)
J5-Y
CB11 (DATA ARC-164)
*J11-H
CB18 (IP-1251A & TT-772)
*J11-D
CB18 (IP-1251A & TT-772)
*J9-A
CB9 (DF & ECM IND PNL)
J4-C
CB15 (KY-58)
J5-F
CB17 (F1429)
J5-U
CB19 (KY-58)
J5-b
CB10 (VOICE ARC-164)
*J11-B
CB18 (IP-1251A & TT-772)
*J11-F
CB18 (IP-1251A & TT-772)
*J9-C
CB9 (DF & ECM IND PNL)
* Voltage bleeds slowly after circuit breaker is pulled due to in-line filters.
SECTION IV. MAINTENANCE OF POWER DISTRIBUTION BOX
5-8. General. This section provides maintenance procedures that are the responsibility of general support
maintenance personnel. Paragraph 5-9 contains general inspection and cleaning instruction for the power
distribution box. Subsequent paragraphs contain specific maintenance procedures applicable to power
distribution box components shown in figures 5-3 and 5-4. Procedures reference components by parenthetical
numbers keyed to figures 5-3 and 5-4. Perform both the general procedures and the applicable specific
procedures.
5-9. Maintenance Procedures. Remove the top and bottom covers as given in paragraph 5-10a and perform
the following items.
WARNING
Before performing any inspection procedure, ensure that power is
disconnected from the distribution box.
a. Inspection.
(1) Inspect the exterior of the unit for dirt, corrosion, dents, scratches, and chipped paint.
5-15
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |