Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
9-2350-238-20-2
INSTALLATION
1 Install
two
new
preformed
packings
(1)
3 Install  two  new  preformed  packings  (12)
and  connect  two  counterbalance  manifold
and connect two three-spool valve metal
metallic  tube  assemblies  (2)  to  manifold
tube  assemblies  (13  and  14)  to  three-
spool  valve  (15).
assembly
counterbalance
(3).
4 Secure
two
three-spool
valve
metal
tube
2 Install  two  new  preformed  packings  (4),
two  new  preformed  packings  (5),  two
assemblies  (13  and  14)  to  three-spool
boom  cylinder  control  line  flange  adapters
valve  (15)  using  four  split-flange  clamp
halves (16), eight new Iockwashers (17),
(6), four split-flange clamp halves (7),
eight  new  Iockwashers  (8),  and  eight  hex-
and eight hexagon head capscrews (18).
agon  head  capscrews  (9)  connecting  two
counterbalance  manifold  metallic  tube
assemblies  (2)  to  two  elbow  to  adapter
metal
tube
assemblies
(10
and
11).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business