|
|
TM
9-2350-238-20-2
INSTALLATION
1 Install
two
new
preformed
packings
(1)
3 Install two new preformed packings (12)
and connect two counterbalance manifold
and connect two three-spool valve metal
metallic tube assemblies (2) to manifold
tube assemblies (13 and 14) to three-
spool valve (15).
assembly
counterbalance
(3).
4 Secure
two
three-spool
valve
metal
tube
2 Install two new preformed packings (4),
two new preformed packings (5), two
assemblies (13 and 14) to three-spool
boom cylinder control line flange adapters
valve (15) using four split-flange clamp
halves (16), eight new Iockwashers (17),
(6), four split-flange clamp halves (7),
eight new Iockwashers (8), and eight hex-
and eight hexagon head capscrews (18).
agon head capscrews (9) connecting two
counterbalance manifold metallic tube
assemblies (2) to two elbow to adapter
metal
tube
assemblies
(10
and
11).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |