|
|
TM
9-2350-238-20-2
2-56. MAINTENANCE OF BOOM ELEVATING HYDRAULIC LINES AND FITTINGS
(CONT).
REMOVAL
(CONT)
3 Remove
eight
hexagon
head
capscrews
(8), eight Iockwashers (9), four split-flange
lNSPECTION/REPAIR
clamp halves (10), and two boom cylinder
control line flange adapters (11) securing
1 Check
for
broken,
damaged,
or
missing
two elbow to adapter metal tube assem-
parts.
blies (12 and 13) to two counterbalance
manifold metallic tube assemblies (14).
2 Repair is by replacement of authorized
Remove two preformed packings (15) and
parts
(TM
9-2350-238-24P-2).
two preformed packings (16).
4 Disconnect
two
counterbalance
manifold
REASSEMBLY
metallic tube assemblies (14) from
manifold assembly counterbalance (17).
Refer
to
for
complete
reassembly
Remove two preformed packings (18).
of all hydraulic lines and fittings.
DISASSEMBLY
Refer
to
for
complete
disassembly
of all hydraulic lines and fittings.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |