|
|
TM 9-2350-236-20-1
Install 21 new self-locking bolts (11).
9
Remove nut (7), final drive lifting sling,
10
and hoist.
Remove two headless shoulder pins.
11
Install three new self-locking bolts (11).
12
Tighten 24 self-locking bolts (11) to 305 ft-
13
Ib (423 N-m) in cross pattern sequence.
14 Position headlamp guard (12), and install
four screws (13), four washers (14), and
four nuts (15).
15 Install drive sprocket hub assembly (16),
refer to page 2-869.
16 Position fender extension (17) and install
seven washers (18) and seven screws
(19) .
2-765
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |