Click here to make tpub.com your Home Page

Page Title: Reassembly/Installation (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2350-236-20-1
Install 21 new self-locking bolts (11).
9
Remove nut (7), final drive lifting sling,
10
and hoist.
Remove two headless shoulder pins.
11
Install three new self-locking bolts (11).
12
Tighten 24 self-locking bolts (11) to 305 ft-
13
Ib (423 N-m) in cross pattern sequence.
14 Position headlamp guard (12), and install
four screws (13), four washers (14), and
four nuts (15).
15 Install drive sprocket hub assembly (16),
refer to page 2-869.
16 Position fender extension (17) and install
seven washers (18) and seven screws
(19) .
2-765

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business