|
|
TM 9-2350-238-20-1
2-95. MAINTENANCE OF BULKHEAD DISCONNECT TO GENERATOR ARMATURE
ELECTRICAL LEAD.
This task covers:
a. Removal
d. Reassembly
b. Disassembly
e. Installation
c. inspection/Repair
INITIAL SETUP
General Safety Instructions
Materials/Parts
Electrical wire (figure D-2, appx D)
Insulation sleeving (figure D-1, appx D)
Failure to remove or disconnect
References
TM 9-2350-238-24P-1
batteries before removing or installing
any electrical wiring harness or lead
may result in injury or damaged
Equipment Conditions
equipment.
2-640 Batteries disconnected
2-384 Powerplant removed
2-766 Auxiliary drive removed
REMOVAL
Failure to remove or disconnect
batteries before removing or installing
any electrical wiring harness or lead
may result in injury or damaged
equipment.
Wiring harnesses and leads are secured
1
to the hull and components with loop
clamps, straps, clips, ground screws, etc.
Remove only the hardware which secures
the wiring harness or lead being removed.
Tag and disconnect plug connector (1)
2
from voltage regulator.
Tag and disconnect cable terminal (2)
3
from generator armature, terminal B.
Remove bulkhead disconnect to generator
4
armature electrical lead (3) from hull.
2-668
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |