|
|
TM 9-2350-238-20-1
To access electrical leads, open aft air cleaner blower door assembly.
Step 3.
Disconnect lead 345 from aft air cleaner centrifugal fan. Place red probe
in lead 345 (terminal end). Ground black probe. Set MASTER and INST
switches ON. If multimeter indicates no voltage, go to step 5. If
multimeter indicates about 24 volts, go to step 4. Set MASTER and INST
switches OFF. Connect lead 345 to aft air cleaner centrifugal fan.
Disconnect lead GND from aft air cleaner centrifugal fan. Check continuity
Step 4.
between lead GND (pin end) and chassis ground. If no continuity exists,
repair ground lead. Refer to page 2-371. If continuity exists, repair or
replace aft air cleaner centrifugal fan. Refer to page 2-446. Connect lead
GND to aft air cleaner centrifugal fan.
2-125
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |