2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: HEATER/DEFROSTER TUBING REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
18-15. HEATER/DEFROSTER TUBING REPLACEMENT
This task covers:
a. Removal
c. Installation
b. Cleaning/Inspection
d. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Materials/Parts
Batteries disconnected (para 7-61).
Adhesive (Item 1, Appendix C)
Tags, Identification (Item 32, Appendix C)
Ties, Cable, Plastic (Item 34, Appendix C)
Tools and Special Tools
Tool Kit, Genl Mech (Item 54, Appendix F)
a. Removal
(1) Remove 13 screws (1) and dash access
panel (2) from dash (3).
(2) Remove nine screws (4) and dash cover
panel (5) from dash (3).
(3) Remove 10 screws (6) and heater front
plate (7) from heater assembly (8).
NOTE
Location of plastic cable ties should
be marked before removal.
(4) Remove two cable ties (9) from heater
tube (10) and tube (11).
(5) Remove  seven  screws  (12)  from
instrument panel (13).
(6) Tilt top of instrument panel (13) toward
steering wheel (14).
18-56 Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business