2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
(20) Install hoses (22 and 55) on pipe (56) with
clamps (57 and 58). Torque to 40 lb-in.
(4.5 N m).
(21) Install hoses (53 and 55) on pipes (59 and
60) with clamps (61 and 62). Torque to 40
lb-in. (4.5 Nm).
c. Follow-On Maintenance
(1) Fill cooling system (para 6-2).
(2) Start engine (TM 9-2320-360-10).
(3) Check for leaks (TM 9-2320-360-10).
(4) Shut off engine (TM 9-2 320-360-10).
(5) Install inner fender (para 16-34).
Change 2 18-55

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business