2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: POGO STICK ASSEMBLY REPAIR
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
11-42. POGO STICK ASSEMBLY REPAIR
This task covers:
a. Disassembly
c. Follow-On Maintenance
b. Assembly
INITIAL SETUP
Equipment Conditions
Materials/Parts
Tractor protection valve removed (para 11-18).
Lockwasher (Item 104, Appendix G)
12 Pin trailer electrical connector removed
Locknuts (4) (Item 44, Appendix G)
Locknuts (2) (Item 61, Appendix G)
7 Pin electrical connector removed
Locknut (Item 68, Appendix G)
Personnel Required
Two
Tools and Special Tools
Tool Kit, Gent Mech (item 54, Appendix F)
a. Disassembly
(1) Remove cap (1) from pogo stick tube (2).
(2) Remove locknut (3), screw (4), and strap
(5) from pogo stick tube (2).  Discard
locknut
(3) Remove locknut (6), screw (7), and strap
(8), from pogo stick tube (2).  Discard
locknut.
(4) Remove two locknuts (9), screws (10),
and holder (11) from pogo stick tube (2).
Discard locknuts.
11-200

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business