7-96. VENTILATOR REPAIR
This task covers:
Removal
Assembly
Disassembly
Installation
Cleaning/inspection
Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Materials/Parts (cont)
Batteries disconnected (para 7-61).
Foam Strip (Figure D-10, Appendix D)
Locknuts (28) (Item 65, Appendix G)
Locknuts (7) (Item 73.2, Appendix G)
Tools and Special Tools
Tool Kit, Genl Mech (Item 54, Appendix F)
Locknuts (2) (Item 73.1, Appendix G)
Riveter, Blind, Hand (Item 36.1, Appendix F)
Lockwasher (Item 93.0.1, Appendix G)
Nut, Push (Item 126.1, Appendix G)
Rivets, Pop (Item 158.1, Appendix G)
Materials/ Parts
Adhesive-Sealant, Silicone
Seal Ring (Item 164.0.1, Appendix G)
(Item 3, Appendix C)
Grease, Automotive and Artillery
Personnel Required
(Item 17, Appendix C)
Two
Tape, Insulation, Electrical
(Item 33, Appendix C)
a. Lower Plenum Removal
(1) Loosen locknut (1) and remove cable
knob
(2) and locknut from cable assembly (3).
Discard locknut.
NOTE
Cable locking nut contains a ferrel
insert.
(2) Remove cable locking nut (4) from cable
assembly (3).