2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
7-88. STE-ICE SHUNT REPLACEMENT (CONT)
(2) Install wire no. 1828 (5) and wire no.
1829 (6) on shunt (1) with two new
lockwashers (7), washers (8), and screws
(9).
(3) Install two cables no. 1138 (10 and 11) on
shunt (1) with two new lockwashers (12)
and screws (13).
NOTE
Do step (4) only if arctic kit is
installed.
(4) Install two cables no. 1128 (14 and 15) on
shunt (1) with two new lockwashers (16)
and screws (17).
c. Follow-On Maintenance
(1) Connect batteries (para 7-61).
(2) Install stowage box (para 16-14).
7-268

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business