2320-01-318-9902 EIC:B5C, VOLUME NO. 2">
|
|
TM 9-2320-360-20-2
7-88. STE-ICE SHUNT REPLACEMENT
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Stowage box removed (para 16-14).
Tags, Identification (Item 32, Appendix C)
Batteries disconnected (para 7-61).
Locknuts (4) (Item 72, Appendix G)
Lockwashers (4) (Item 109, Appendix G)
Lockwashers (2) (Item 108, Appendix G)
Tools and Special Tools
Tool Kit, Genl Mech (Item 54, Appendix F)
Personnel Required
Two
a. Removal
NOTE
Tag and mark all Wires before
removing from shunt.
Do step (1) only if arctic kit is
installed.
(1) Remove two screws (1), lockwashers (2),
and two cables no. 1128 (3 and 4) from
shunt (5). Discard lockwashers.
7-266
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |