2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Battery Installation cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
7-57. BATTERY CABLE AND TERMINAL/BATTERY/BATTERY BOX REPAIR (CONT)
(4) Install cable (17) on negative (-) terminal
(18) with screw (19), two washers (20),
new  lockwasher  (21),  and  nut  (22).
Torque to 144-192 lb-in. (16.1-21.5 Nm).
(5) Install cables (23 and 17) on negative (-)
terminal (24) with screw (25), two washers
(26) new lockwasher (27), and nut (28).
Torque to 144-192 lb-in. (16.1-21.5 Nm).
(6) Install negative (-) terminals (18 and 24)
on negative (-) battery posts (29 and 30).
Do not tighten.
(7) Install cable (31), wires no. 241 and no.
240 (32), and wire no. 1622 (33) on
positive (+) terminal (34) with screw (35),
two washers (36), new lockwasher (37),
and nut (38).  Torque to 144-192 lb-in.
(16.1-21.5 Nm).
(8) Install cables (31 and 39) on positive (+)
terminal (40) with screw (41), two washers
(42), new lockwasher (43), and nut (44).
Torque to 144-192 lb-in. (16.1-21.5 Nm).
(9) Install positive (+) terminals (34 and 40)
on positive (+) battery posts (45 and 46).
Do not tighten.
7-170 Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business