2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
NOTE
Route two wires no. 150 under hold
down bracket.
(10) Install cable (47) and two wires no. 150
(48) on negative (-) terminal (49) with
screw  (50),  two  washers  (51),  new
lockwasher (52), and nut (53). Torque to
144-192 lb-in. (16.1-21.5 Nm).
(11) Install cables (47 and 54) and wire no.
1813 (55) on negative (-) terminal (56)
with screw (57), two washers (58), new
lockwasher (59), and nut (60). Torque to
144-192 lb-in. (16.1-21.5 Nm).
(12) Install two negative (-) terminals (49 and
56) on battery posts (61 and 62).
(13) Tighten nuts (63 thru 70) to 84-96 lb-in.
(9.4-10.8 Nm).
(14) Lightly coat all battery posts and terminals
with anticorrosion grease.
J. Follow-On Maintenance
(1) Install accessory air supply coupling (para 11-41).
(2) Install no. 3 air reservoir (para 11-21).
(3) Install no. 4 air reservoir (para 11-22).
(4) Connect arctic kit batteries if installed (para 19-2).
(5) Start engine to check operation of batteries (TM 9-2320-360-10).
(6) Shut off engine (TM 9-2320-360-10).
(7) Install battery box cover (TM 9-2320-360-10).
(8) Remove wheel chocks.
Change 1 7-171

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business