TM 9-2320-360-20-2
NOTE
Route two wires no. 150 under hold
down bracket.
(10) Install cable (47) and two wires no. 150
(48) on negative (-) terminal (49) with
screw (50), two washers (51), new
lockwasher (52), and nut (53). Torque to
144-192 lb-in. (16.1-21.5 Nm).
(11) Install cables (47 and 54) and wire no.
1813 (55) on negative (-) terminal (56)
with screw (57), two washers (58), new
lockwasher (59), and nut (60). Torque to
144-192 lb-in. (16.1-21.5 Nm).
(12) Install two negative (-) terminals (49 and
56) on battery posts (61 and 62).
(13) Tighten nuts (63 thru 70) to 84-96 lb-in.
(9.4-10.8 Nm).
(14) Lightly coat all battery posts and terminals
with anticorrosion grease.
J. Follow-On Maintenance
(1) Install accessory air supply coupling (para 11-41).
(2) Install no. 3 air reservoir (para 11-21).
(3) Install no. 4 air reservoir (para 11-22).
(4) Connect arctic kit batteries if installed (para 19-2).
(5) Start engine to check operation of batteries (TM 9-2320-360-10).
(6) Shut off engine (TM 9-2320-360-10).
(7) Install battery box cover (TM 9-2320-360-10).
(8) Remove wheel chocks.
Change 1 7-171
|