2320-01-318-9902 EIC:B5C, VOLUME NO. 2">
|
|
TM 9-2320-360-20-2
h. Battery Installation
NOTE
Batteries should be positioned with
positive (+) posts facing left front.
(1) Install four batteries (1) in battery box (2)
using handles (3).
CAUTION
Wiring should be positioned between
batteries prior to installation of two
battery retainers. Failure to comply
may result in damage to wiring.
(2) Install two battery retainers (4) on rear
studs (5) under nuts (6).
(3) Place two battery retainers (4) on forward
studs (7).
(4) Install two new locknuts (8) on forward
studs (7).
WARNING
Acid resistant paint can burn easily,
can give off harmful vapors, and is
harmful to skin and clothing. To
avoid Injury or death, keep paint
away from open fire and use in well
ventilated area. If paint gets on skin
or clothing, wash immediately with
soap and water.
(5) Paint all mounting hardware with acid
resistant paint.
I. Battery Cable and Terminal Installation
(1) Install cables (1 and 2), wire no. 1814 (3),
and wire no. 1822 (4) on positive (+)
terminal (5) with screw (6), two washers
(7), new lockwasher (8), and nut (9).
Torque to 144-192 lb-in. (16.1-21.5 Nm).
(2) Install cable (1) on positive (+) terminal
(10) with screw (11), two washers (12),
new lockwasher (13), and nut (14).
Torque to 144-192 lb-in. (16.1-21.5 Nm).
(3) Install positive (+) terminals (5 and 10) on
battery posts (15 and 16). Do not tighten.
Change 1 7-169
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |