2320-01-318-9902 EIC:B5C, VOLUME NO. 2">
|
|
TM 9-2320-360-20-2
7-16. TOGGLE SWITCH/LIGHT REPLACEMENT
This task covers:
a. Removal
c.
Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Instrument panel removed (para 7-13)
Tags, Identification (Item 32, Appendix C)
(Instrument panel switches only).
Batteries disconnected (para 7-61).
Tools and Special Tools
Tool Kit, Genl Mech (Item 54, Appendix F)
a. Removal
NOTE
Do step (1) only for engine brake
switch(es) or DDEC III diagnostic
request switch.
(1) Remove 19 screws (0.1) and 3 panels
(0.2) from electronic control box (0.3).
NOTE
All toggle switches are replaced
the same way.
Tag and
mark
wires
before
removal.
To remove light assembly only,
do steps (1.1) and (2).
(1.1) Remove connector (1) and light assembly
(2) as one unit from switch (3).
(2) Remove light assembly (2) from connector
(1).
NOTE
Connector is removed by gently
prying up on clip and pulling on
connector.
(3) Remove connector (4) from switch (3).
NOTE
Remove switch by simultaneously
pinching both locktabs of switch and
pushing switch out of instrument
panel.
(4) Remove switch (3) from instrument panel
(5).
(5) Remove applique (6) from switch (3).
Change 3 7-51
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |