|
|
TM 9-2320-285-24-1
2-30. 24V INVERTER MAINTENANCE (CONT)
STEP
LOCATION
ITEM
ACTION
REMARKS
INSPECTION/REPAIR (cont)
7
j. All other parts
Inspect
Replace if cracked, broken,
(cont)
distorted, or threads
damaged
INSTALLATION
8
Right hand
a. Cover (34) and
Install
On 7-wire cable (32)
frame rail
clamp (33)
and rear
b. 7-wire cable
Route and
Install all clamps and tie
crossmember
(32)
secure
straps as noted during
removal
9
Tractor cab
a. Plastic tubing
a. Install
Pull open at slit and install
under hood
(30)
around three electrical
at rear
wires (31)
b. Tape
Wrap new electrical tape
around plastic tubing at
locations noted during
removal
c. Position
Route plastic tubing with
electrical wires (31) in
tractor
b. 24-volt recep-
Position
Push electrical wires (28)
tacle (27)
through receptacle cutout
with electri-
in rear hood enclosure;
cal wires
align receptacle mounting
(28)
holes with cover hinge at
the top
c. Four capscrews
Install and
(26), lock
tighten
washers (25),
and nuts (24)
d. Plastic tubing
a. Install
Pull open at slit and install
(23)
around electrical wires
(28)
b. Tape
Wrap new electrical tape
around plastic tubing and
24-volt receptacle at
locations noted during
removal
e. 7-wire cables
Position
At rear hood enclosure post
(29 and 32)
white wires
f. Screw (21) and
Install
Secures white wires (ground
washer (22)
leads)
2-313
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |