|
|
TM9-2320-270-20-3
This task covers:
a. Removal (page 4-1164)
b. Installation (page 4-1168)
INITIAL SETUP
Tools
Materials/Parts
Hammer, plastic
Cotter pin
Handle, ratchet, 3/8-inch drive
Gaskets (three required)
Handle, ratchet, 1/2-inch drive
Lockwashers, U-bolts (eight required)
Knife, pocket
Nipple, reservoir
Knife, putty
Packing, preformed, filter base
Lifting equipment
Seal, washer,
Pliers, diagonal-cutting
Tape, teflon (item 22, appendix C)
Screwdriver, flat-tip, 5/16-inch
Wrap, tie (item 24, appendix C)
Socket, 1/2-inch, 1/2-inch drive
Socket, 15/16-inch, 1/2-inch drive
Personnel Required
Socket handle, 1/2-inch drive
Vise, machinist's
One
Wrench, adjustable, 0 to 3 5/8-inch
(two required)
Equipment Condition
Wrench, open-end, 1/2-inch
Wrench, open-end, 5/8-inch
Spare tire removed (TM 9-2320-270-10).
Wrench, open-end, 9/16-inch
Spare tire mount removed (page 4-1055).
Wrench, open-end, 15/16-inch
Hydraulic reservoir drained (page 4-1160).
(two required)
Hydraulic oil filter removed (page 4-1172).
Wrench, open-end, 1 1/16-inch
Wrench, pipe (two required)
4-1163
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |