HYDRAULIC RESERVOIR DRAINING AND FILLING
This task covers:
a. Draining (page 4-1160)
b. Filling (page 4-1162)
INITIAL SETUP
Materials/Parts
Tools
Cement, gasket (item 2, appendix C)
Barrels, steel, 55-gallon (two
Gasket, filter assembly
required)
Lockwashers (four required)
Knife, putty
Pan, drain
Personnel Required
Pump, rotary hand
Wrench, open-end, 1/2-inch
One
Wrench, open-end, 5/8-inch
Wrench, open-end, 2-inch
Equipment Condition
Wrench, pipe
Spare tire removed (TM 9-2320-270-10).
ACTION
ITEM
REMARKS
LOCATION
DRAINING
Using pipe wrench, unscrew and slide back
Union (2)
1. Pipe (1)
along pipe.
a. Using 1/2-inch wrench, unscrew and
Four screws (4) and
2. Cover (3)
take out.
Iockwashers (5)
b. Get rid of Iockwashers (5).
Lift out.
Cover (3) and
3. Reservoir (6)
filter (7)
4-1160
|