TM9-2320-270-20-3
WINCH VALVES TO MOTORS HYDRAULIC LINES
This task covers:
a. Removal (page 4-1146)
b. Installation (page 4-1148)
INITIAL SETUP
Materials/Parts - Continued
Tools
Lockwashers, hose clamps (four required)
Wrench, open-end,
7/16-inch
Lockwashers, winch control panel
(two required)
(12 required)
Wrench, open-end,
1/2-inch
Packing, preformed, hose
Wrench, open-end,
5/8-inch
Tag, marking (item 18, appendix C)
Wrench, open-end,
1 1/2-inch
Wrench, open-end,
2-inch
Personnel Required
Materials/Parts
One
Hose plugs
Lockwashers, cover deck
(four required)
ACTION
ITEM
REMARKS
LOCATION
REMOVAL
NOTE
Tag hoses according to general maintenance instructions.
There are four sets of hoses. This procedure is for one set. Repeat for other three.
12 screws (2),
a. Using 1/2-inch wrench, unscrew and
1. Winch control
take off.
Iockwashers (3),
panel (1)
b. Get rid of Iockwashers (3).
and washers (4)
Take off.
Front cover
2.
plate (5)
Four screws (7),
a. Using two 7/16-inch wrenches, unscrew
3. Cover deck (6)
lockwashers (8),
and take off.
and nuts (9)
b. Get rid of Iockwashers (8).
Lift off.
Cover deck (6)
4. Rear winch and
tire carrier
assembly (10)
4-1146
|