Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-3
RIGHT AIR PILOT VALVE - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
INSTALLATION - CONTINUED
Using slip-joint pliers, put on.
Two new tie
30. Hose harness (1)
wraps (2)
NOTE
Check for proper operation (TM 9-2320-270-10) and
FOLLOW-ON MAINTENANCE:
check for air leaks (page 4-1).
TASK ENDS HERE
FRONT SPRING PINS
This task covers:
d. Front Rear Pin Removal (page 4-1077)
a. Front Front Pin Removal
e. Front Rear Pin inspection/Replacement
b. Front Front Pin Inspection/
f. Front Rear Pin installation (page 4-1078)
Replacement (page 4-1076)
c. Front Front Pin Installation (page 4-1076)
INITIAL SETUP
Personnel Required
Tools
One
Driftpin, brass, 1/2-inch
Hammer, machinist's ball-peen
Equipment Condition
Lifting equipment, 30,000 pound
capacity
Pitman arm to booster drag link removed
Punch, drive pin, 3/16-inch
(page 4-962) (for left rear spring pin
Trestle, automotive (two required)
only).
Wrench, open-end, 7/16-inch
Wrench, open-end, 3/4-inch
TA240671
4-1074

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business