Click here to make tpub.com your Home Page

Page Title: PITMAN ARM TO BOOSTER DRAG LINK
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9-2320-270-20-3
PITMAN ARM TO BOOSTER DRAG LINK
This task covers:
e.
Cleaning (page 4-965)
a.
Inspection (page 4-962)
f.
Inspection/Replacement (page 4-965)
b.
Adjustment (page 4-963)
Assembly (page 4-965)
c.
Removal (page 4-964)
9.
Installation (page 4-966)
h.
d.
Disassembly (page 4-965)
INITIAL SETUP
Materials/Parts
Tools
Cotter pin, boster ball stud
Hammer, plastic
Cotter pin, spring seat plug
Handle, ratchet, 1/2-inch drive
Drag link dust seal and felt kit
Key, socket head screw, 3/16-inch
Grease (LO 9-2330-270-1 2)
Pliers, long-nose, round
Puller, mechanical, gear and bearing
Personnel Required
Retrieving tool, magnetic
Screwdriver bit, 13/6-inch,
One
1/2-inch drive
Socket, 1 1/4-inch, 1/2-inch drive
Woodblock
Wrench, open-end, 7/16-inch
ACTION
ITEM
REMARKS
LOCATION
INSPECTION
Truck
Park on level surface with wheels positioned
1.
straight ahead (TM 9-2320-270-10).
Move forward and backward, up and down.
Drag link (2)
2. Pitman arm (1)
Drag link should be able to rock
back and forth on pitman arm ball,
but there should be no looseness.
if any looseness, go to step 3.
Move right and left, up and down.
Drag link (2) and
3. Steering booster (3)
ball stud (4)
Drag link and ball stud should be
able to rock back and forth on bail
stud seats, but there should be no
looseness. if any looseness, notify
direct support maintenance.
4-962

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business