|
|
TM 9-2320-270-20-2
AUXILIARY THROTTLE SHUTOFF SOLENOID VALVE
This task covers:
d. Inspection/Replacement (page 4-762)
a. Removal (page 4-760)
e. Assembly (page 4-763)
b. Disassembly (page 4-762)
f. Installation (4-764)
c. Cleaning (page 4-762)
INITIAL SETUP
Materials/Parts Continued
Tools
Lockwasher, valve to underdash bracket
Hammer, plastic
Soap, liquid (item 14, appendix C)
Handle, ratchet, 3/8-inch drive
Tag, marking (item 18, appendix C)
Pliers, diagonal-cutting
Tape, teflon (item 22, appendix C)
Pliers, long-nose, round
Wrap, tie (item 24, appendix C)
Pliers, slip-joint, straight-nose
Socket, 7/16-inch, 3/8-inch drive
Personnel Required
Vise
Wrench, box, 7/16-inch
One
Wrench, open-end, 9/16-inch
Wrench, open-end, 5/8-inch
Equipment Condition
Wrench, open-end, 1 1/16-inch
Instrument panel open (page 4-244).
Materials/Parts
Lockwasher, valve to underdash panel
ACTION
REMARKS
ITEM
LOCATION
REMOVAL
NOTE
It is not necessary to remove entire valve to replace coil housing. To replace coil and
housing, perform steps 1 to 10 and 41 to 51.
It is not necessary to remove entire valve to service filter. To service or replace filter,
perform steps 1 to 5 and 11,21 to 24,28 to 31 and 40.
Tag wires and hoses according to general maintenance instructions (page 4-1).
4-760
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |