Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-2
AUXILIARY THROTTLE SHUTOFF SOLENOID VALVE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION
Valve (2)
Put in place.
29. Panel (1)
Screw (3),
Screw together but do not tighten.
30. Valve (2) to
Iockwasher (4),
panel (1)
and nut (5)
Air line 492 (7)
Lube end lightly with soap and push in.
31. Elbow (6)
Nut (8)
Screw on and tighten using 5/8-inch
32. Air line 492 (7)
wrench.
to elbow (6)
Lube end lightly with soap and push in.
Air line 750 (10)
33. Elbow (9)
Nut (11)
Screw on and tighten using 5/8-inch
34. Air line 750 (10)
wrench.
to elbow (9)
Breather
a. Wrap threads with teflon tape
35. Valve (2)
(page 4-1).
b. Screw in and tighten using 1 1/16-inch
wrench.
Coil housing (13)
Put on.
36.
and data plate (14)
Plastic cap (15)
a. Snap split ring (16) into groove (17).
37. Coil housing (13)
b. Snap shut.
to valve (2)
Put on.
Ground lead (19) and
38. Screw (18)
new Iockwasher (20)
Screw (18), new
Screw in and tighten using 7/16-inch box
39. Valve (2) to under-
wrench, socket, and handle.
Iockwasher (21),
dash panel (1)
and nut (22)
Screw (3) and
Using 7/16-inch box wrench, socket, and
40. Valve (13) to
nut (5)
handle tighten.
panel (1)
Bullet plug (25)
Plug in.
41. Bullet connector
on coil lead (26)
(23) on wire
170 (24)
4-764

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business